Home


 

CENTRA – Casing Centralization Model

In directional wells, proper casing centralization is essential to ensure proper cement bonding. CENTRA calculates centralizer spacings for any directional well. Casing deflection and centralizer properties are considered to predict casing stand-off, centralizer spacing, and hook loads for running casing.

View QuickTour of CENTRA

Advanced Engineering Features

  • Considers casing deflection and centralizer compression
  • Models 3D wellbores
  • Provides both fixed- and hinged-end casing bending models
  • Either equal spacings or minimum stand-off designs
  • Both centralizing and tripping operations
  • 15 sections of tubular string and 25 well intervals
  • Both whole-well and single-span casing analyses
  • Allows combination of bow-spring and rigid centralizers
  • Includes extensive tubular database

Cost Saving

  • Prevents poor cement jobs
  • Enhances operational efficiency

Easy to Use

  • Step-by-step problem solving approach
  • Can link to databases such as DIMS
  • Can create MS Office reports
  • Advanced graphics can be exported to any Windows program
  • S.I., Oilfield and mixed units

A variety of options are provided for designing centralizer placement.

The output illustrates centralizer placement and spacing, as well as hook loads during cementing.

The Sensitivity utility compares the impacts of changes in fluid weights, friction factor, and casing weight.